Battery-free sensing · Applications
ApplicationsProblems battery-free sensing could solve
Over more than 20 years, customers have brought us problems where a cable or a battery does not fit. Most of the ones below come from their enquiries. None of them is a product today: each one starts with a feasibility study, typically four to five weeks.
It moves or it spins
No cable survives a part that turns or travels.
Manufacturing · energyTemperature on a spinning rotor
Motors and generators, measured on the rotor itself and read without contact.
Read the article
AutomotiveInside the tyre, at service time
Tyre identity and service-time readings with RFID and NFC. In-motion TPMS stays battery-powered.
Read the articleIt is sealed for life
Nothing inside can need a battery change.
It is live or out of reach
Where a wire is a risk, or nobody can get to it.
UtilitiesHot spots on live busbars
Temperature at the joints of live switchgear, with no wire across the insulation.
Read the article
Buildings · infrastructureA structure after a disaster
Beam deformation, water ingress and tilt, reported without waiting for an inspection.
Read the article
ManufacturingA sensor built into the product
Designing the sensor into the product while it is made, before the enclosure drawing is frozen.
Read the articleThere are too many to maintain
A thousand batteries are a maintenance plan of their own.
Data centresEvery rack in a data centre
Where the heat is, rack by rack, to cut cooling without risking hot spots.
Read the article
Data centresRacks, doors and aisles into the DCIM
Less cabling, no battery swaps, and clean data into the management system.
Read the article
LogisticsThe cold chain on site
Rooms, docks and portals, read as goods pass. In transit, battery loggers still win.
Read the article
LogisticsWeight, identity and climate in a warehouse
The same sensors, read with RFID or BLE depending on the infrastructure you have.
Read the article
AgricultureSoil across a whole field
Moisture, temperature and conductivity, so irrigation goes only where it is needed.
Read the articleYou need to know its state, or change it
Not only measuring: checking and acting.
ManufacturingIs that switch open or closed?
Switches, interlocks and locks, checked without wires or batteries instead of by hand.
Read the article
Buildings · energyIs the backup battery full?
Emergency lighting, fire panels, telecom cabinets and UPS: the battery that has to be full on the day everything else fails.
Read the article
ManufacturingFrom sensing to acting
A prototype battery-free RFID relay that switches a low-power circuit with the energy of the reader.
Read the article
MaintenanceReadings on the maintenance round
Sensors read with a phone over NFC, on the route the technician already walks.
Read the articleNot on the list?
Tell us what you need to measure and why a cable or a battery does not work there. The first step is a feasibility study, typically four to five weeks, and it ends with whether it can be done and what it would take.
Tell us about your problem Does your asset need battery-free?

